Released flow of the stream and a passive seismic GIA instrument

Kněžmostka stream:
Blasting works for releasing the stream flow in the zones of intense mudding

Client:
Povodí Labe s. p.

Duration:
2015 - 2016

Goals of the project:
The aim of the task was to perform safe blasting works, which will free the flow of the stream. The blasting work was preceded by resistivity tomography, which checked the stability of the sandstone walls of the valley, and the blasting work itself was then continuously checked by passive seismic measurements.