Kněžmostka stream:
Blasting works for releasing the stream flow in the zones of intense mudding
Client:
Povodí Labe s. p.
Duration:
2015 - 2016
Goals of the project:
The aim of the task was to perform safe blasting works, which will free the flow of the stream. The blasting work was preceded by resistivity tomography, which checked the stability of the sandstone walls of the valley, and the blasting work itself was then continuously checked by passive seismic measurements.